Content |
Parameters |
Standard: |
EN50470-1/3 |
Rated Voltage: |
230V |
Rated Current: |
0,25-5(30)A,0,25-5(32)A,0,25-5(40)A,0,25-5(45)A, |
Impulse Constant: |
1000 imp/kWh |
Frequency: |
50Hz |
Accuracy Class: |
Class B |
LCD Display: |
LCD 5+2 = 99999.99kWh |
Working Temperature: |
-25~70℃ |
Storage Temperature: |
-30~70℃ |
Power Consumption: |
<12VA <1W |
Average Humidity: |
≤75% (Non Condensing) |
Maximum Humidity: |
≤95% |
Start Current: |
0.004Ib |
Case Protection |
IP51 indoor |
Type |
DEM1E001 |
DEM1E003 |
DEM1E103 |
Software Version |
V101 |
V101 |
V101 |
CRC |
5A8E |
B6C9 |
6B8D |
Impulse Constant |
1000imp/kWh |
1000imp/kWh |
1000imp/kWh |
Communication |
N/A |
RS485 Modbus/DLT645 |
RS485 Modbus/DLT645 |
Baud rate |
N/A |
9600\19200\38400\115200 |
9600\19200\38400\115200 |
SO output |
Yes, with variable constant 100-2500imp/kWh Divisible by 10000 as default
|
Yes, with variable constant 100-2500imp/kWh Divisible by 10000 as default
|
Yes, with variable constant 100-2500imp/kWh Divisible by 10000 as default
|
Pulse width |
SO:100-1000:100ms SO:1250-2500:30ms |
SO:100-1000:100ms SO:1250-2500:30ms |
SO:100-1000:100ms SO:1250-2500:30ms |
Backlight |
Blue |
Blue |
Blue |
Li-Battery |
N/A |
N/A |
YES |
Multi-tariff |
N/A |
N/A |
YES |
Measurement Mode |
1-total =forward 2-Total=reverse 3-Total =forward +reverse (default) 4-Total=Forward-Reverse |
1-total =forward 2-Total=reverse 3-Total =forward +reverse (default) 4-Total=Forward-Reverse |
1-total =forward 2-Total=reverse 3-Total =forward +reverse (default) 4-Total=Forward-Reverse |
Button |
Touch button |
Touch button |
Touch button |
Button function |
Page turning, setting, information display |
Page turning, setting, information display |
Page turning, setting, information display |
Default setting |
1000imp/kWh,100ms |
1000imp/kWh,100ms 9600/NONE /8/1 |
1000imp/kWh,100ms 9600/NONE /8/1 |
Measurement Mode setting |
Button |
RS485 or Button |
RS485 or Button |
DEM1E001
DEM1E003/103
Height 90mm
Width 18mm
Depth 72mm
It requires an experienced electrician or professional to install energy meter, and the user guide shall be completely read;
During the installation process, if the meter case has obvious damage marks caused by a violent impact or fall, please do not install, or power up, and please promptly contact with us;
The energy meter is inspected before leaving the factory and can be installed and used directly; The meter should be installed in an indoor or outdoor meter box.The mounting base shall be fixed on a sturdy and refractory wall without corrosive gas in the air;
The mounting base shall be fixed on a sturdy and refractory wall with no corrosive gas in the air; The meter shall be wired according to the wiring diagram on terminal case, preferably by copper wire or copper wiring head.
https://www.ytl-e.com/contact/
Established in 2000, Zhejiang Yongtailong Electronic Co., Ltd. is located in the center of Shanghai, Hangzhou and Suzhou cities. YTL is a professional China YTL DEM1E series Din-Rail China Single Phase kWh Meter Suppliers and YTL DEM1E series Din-Rail China Single Phase kWh Meter Company. With more than 20 years of energy metering experience, we devote ourselves to providing competitive projects and creating value for customers. YTL was one of the first companies in the domestic market with which had an internal R&D department as well as international sales business. Since our foundation in 2000 we have grown to a manufacturer which complies and meet to many specifications from our national and international partners. At present our export volume makes us a leading company for technology and product export to more than 50 countries throughout the world. With provincial high-tech enterprise R&D center, YTL is the Top 100-enterprise with most investment value in Zhejiang. And“Yongtailong”is the famous brand of Zhejiang. For any new products of customers, we will communicate with customers very professionally, listen to their opinions and give useful suggestions to ensure that excellent quality products are made.
Established In
Employees
Export Country
Design Right Patent
The process of implementing load management with smart meters involves real-time monitoring of users' electricity usage, optimizing electricity usage through da...
As an indispensable part of modern building management, building power measurement is characterized in many aspects, including accuracy, real-time, high efficie...
Single-phase meters with MID, that is, single-phase energy meters that comply with the EU Metering Directive (MID) standard, have been widely used in power syst...
three phase meters with MID is an instrument used to measure and record three-phase AC electric energy in the power system. It has obtained the MID (Measuring I...
There is an inseparable relationship between wireless IoT communication technology and smart home systems. As the core support of smart home systems, wireless I...
As an important part of smart home, smart switch has various functions and brings great convenience and intelligent experience for Modern Family life. Here are...